The process starts with a surface flatness inspection and drainage check. Greensboro’s humid summers and freeze-thaw winters accelerate coating breakdown and widen existing cracks. The inspection measures crack width, checks adhesion of the existing surface, and identifies any low spots causing pooling water, a common issue on HOA and park courts built over clay-heavy subsoil.
Crack filler and patching compound are applied once the base condition is confirmed as sound. Cracks wider than a surface-level split may indicate base movement, which requires asphalt base repair before any coating goes down. Applying a multi-coat acrylic finish system over an unrepaired base produces a surface that fails within one or two seasons.
Resurfacing and court line striping complete the scope. The acrylic coating is applied in multiple passes using a squeegee or roller technique, building up to the specified coat count for the surface type. Fresh court line striping paint is applied last, with line positions confirmed against the agreed sport layout before the final walkthrough.
Why Choose Us
Why choose Greensboro Sports Courts for court resurfacing?
Every job is scoped in writing after an on-site inspection, so the estimate reflects what the court actually needs.
Inspection Before Any Commitment
An on-site evaluation of the surface and drainage happens before a single line item is priced or booked.
Itemised Written Estimate
The written estimate lists base prep, patching, coating, and striping as separate line items, no lump-sum surprises.
Signed-Off Final Walkthrough
The job is not closed until you walk the finished court and confirm the work matches the agreed scope.
Backyard to HOA Scale
We cover private backyard courts, HOA facilities, school courts, and commercial property courts across the area.
Wide Service Area
Coverage spans Greensboro, Winston-Salem, High Point, Kernersville, Clemmons, and surrounding communities.
Do small cracks always mean I need full resurfacing?
No, small, isolated cracks under about a quarter-inch wide are usually candidates for crack filler rather than full resurfacing. The deciding factor is whether the base beneath is still stable. If cracks are spreading in a pattern, widening seasonally, or accompanied by surface heaving, the base may be failing and resurfacing becomes the more cost-effective fix.
Can my worn court be fixed without replacing the whole surface?
Yes, in many cases. Localized wear, faded color, and minor cracking can be addressed with targeted repairs and a fresh acrylic coating over the existing surface. Full replacement is only necessary when the base layer has shifted, drainage has failed, or damage covers the majority of the playing area.
How do I know if the damage is just cosmetic?
Cosmetic damage is surface-only: fading, light scuffing, or hairline cracks that don’t move or widen over time. If you press along a crack and feel flex, see water pooling after rain, or notice the surface lifting at the edges, the damage has reached the base and is no longer cosmetic. An on-site evaluation is the reliable way to tell the difference.
Why is my court still slippery after it dries?
Persistent slipperiness after drying usually means the acrylic surface coating has worn through its textured aggregate layer. Once that grit is gone, the underlying binder becomes smooth and slick. Recoating with a sand-filled acrylic system restores traction. Algae or mildew growth can cause the same symptom and requires cleaning before any coating is applied.
How much of the court needs repair before resurfacing makes more sense?
When damaged or deteriorated areas cover roughly 30 percent or more of the total surface, full resurfacing typically costs less per square foot than patching each zone individually. Below that threshold, targeted repairs are usually the better value. The condition of the base matters as much as the area affected, widespread base failure tips the decision toward resurfacing at any percentage.
Will repairs fix cracks, low spots, and drainage problems too?
Crack filling and low-spot leveling are standard repair tasks. Drainage problems are more involved, correcting them may require regrading the base or adding subsurface drainage before any surface work begins. A repair that skips the drainage cause will fail again, so the drainage issue has to be resolved first.
Can a patch repair hold up, or will it fail again soon?
A properly prepared patch, with the damaged area cut back to stable edges, the base compacted, and a compatible filler applied, can hold for several years. Patches fail quickly when they are applied over a soft or moving base, or when the filler material does not match the existing surface system. Preparation quality determines longevity more than the patch material itself.
Is a handyman repair or DIY patch a bad idea for my court?
For sports courts, yes, DIY patches almost always fail within one to two seasons. Court surfaces require specific acrylic or polyurethane systems applied at controlled thickness, and the base must be properly prepared first. A mismatched filler bonds poorly, traps moisture, and can make the underlying damage worse, turning a minor repair into a full resurfacing job.