FAQs
Commercial HOA & School Courts Questions
Every question we get asked about commercial hoa & school courts, answered straight.
Questions
Problems & Symptoms
Will a new court help fix standing water and cracks?
Yes, when the rebuild includes proper sub-base grading and drainage. Standing water and surface cracking are almost always drainage failures, not just surface failures. A new court built with correct slope and a prepared base eliminates the root cause rather than covering it. Learn more about site preparation.
Questions
Cost & Pricing
How much does a commercial court project cost?
Most commercial HOA and school court projects come in at $30,000-$75,000, depending on court size, base condition, surface type, and whether fencing or lighting is included. An itemised written estimate is produced after the on-site evaluation so the board has exact figures before committing.
What affects the cost of resurfacing versus rebuilding a court?
Resurfacing costs less because the existing base is kept. Rebuilding adds excavation, base material, and compaction to the scope. Drainage corrections, fencing replacement, and lighting all add to either option. The on-site evaluation identifies which scope is actually needed so the estimate reflects real conditions, not assumptions.
Can you give us a quote after looking at the court in person?
Yes. Every project starts with an on-site evaluation of the space and drainage, and the itemised written estimate follows from that visit. There is no accurate way to price base preparation, drainage work, or surfacing from photos alone, so the site visit is the starting point for any firm number.
Questions
Is It Right for You?
How do I know if the court layout should be changed for how our property actually uses the space?
The on-site evaluation looks at how residents or students actually use the space, not just what the existing lines say. If a tennis court sits mostly empty but pickleball demand is high, the layout can be reconfigured. Usage patterns, available square footage, and sight lines all factor into the layout recommendation.
What kinds of courts can be built for a HOA or school property?
Tennis, basketball, pickleball, and multi-sport courts are all options for HOA and school sites. Multi-sport layouts combine two or more sports on one surface, which suits properties with limited space but varied demand. Court type, size, and surface material are matched to the expected user group and daily traffic volume.
Is this the right court surface for heavy daily use?
Acrylic-coated asphalt and post-tensioned concrete are the standard choices for high-traffic community and school courts because both handle repeated use without rapid surface degradation. The right pick depends on your sub-base conditions and budget. Surface selection is part of the written estimate produced after the on-site evaluation.
How do I know if our site has enough space for the court we want?
A standard tennis court needs roughly 7,200 sq ft including run-off space; a pickleball court needs about 1,800 sq ft. The on-site evaluation measures the available footprint and checks setbacks, slopes, and obstructions. If the space is tight, a multi-sport or scaled layout may fit where a full-size court cannot.
Can you build a court that matches how our property will actually use it?
Yes. Court type, surface, and layout are chosen based on the actual user group and expected traffic, not a one-size template. A school with PE classes has different needs than a retirement HOA. The evaluation conversation covers usage patterns before any design is proposed. See multi-sport options.
Are your court builds suitable for multi-unit residential properties and community properties?
Yes. HOA facilities and multi-unit residential properties are a core part of the work, alongside school and commercial sites. Courts for those settings are sized and surfaced for shared, high-frequency use rather than single-household traffic. The evaluation accounts for the number of expected users and the hours of daily activity.
Questions
Comparing Your Options
Do we need a full new court, or can the existing one just be resurfaced?
Resurfacing works when the base is structurally sound, no heaving, no widespread cracking, and drainage still functions. If the sub-base has shifted or water is pooling under the surface, resurfacing only delays the same problems. An on-site evaluation checks the base condition first so you get a clear recommendation before any money is committed.
Will patching the court work, or is the damage too widespread for repairs?
Patching works on isolated cracks or small surface failures, but when cracking covers a large portion of the court or follows a pattern, it usually signals base movement. Patching that pattern buys months, not years. A site visit maps the damage extent and tells you whether targeted repairs or a full resurface makes more sense.
How different is this from hiring a general repair person?
A general repair person typically patches visible damage without assessing the base or drainage underneath. Sports court construction requires graded sub-bases, sport-specific slope tolerances, and surface coatings rated for court use. Work done without those steps usually fails within one to two seasons, costing more to redo than a proper build would have.
Questions
How It Works
What is included in a commercial HOA or school court project?
Every project starts with an on-site evaluation and drainage assessment, followed by an itemised written estimate. The scope covers base preparation, surfacing, line marking, and fencing or lighting where needed. The job closes with a final walkthrough before sign-off to confirm everything matches the agreed scope.
Does the work include new court layout, surfacing, striping, and drainage fixes?
Yes. The itemised estimate covers base preparation, surfacing, line striping, and drainage corrections as needed. Fencing and lighting are also included when specified. Each item is listed separately so the board or facilities manager can see exactly what is being done and why.
How much disruption and cleanup should we expect during the project?
The court area is closed during active construction, but surrounding paths and facilities stay accessible in most cases. Debris from demolition or base work is removed as the project progresses. Scheduling is discussed during the estimate phase so the board or school can plan around the closure window.
How long does a court project usually take on a HOA or school property?
Timeline depends on court size, base condition, and whether drainage work is needed. A straightforward resurface typically takes less time than a full rebuild with new base preparation. The written estimate includes a projected schedule so the board or facilities team can plan the closure period in advance.
What should a HOA board or school ask before starting the project?
Ask for an itemised written estimate that separates base work, surfacing, drainage, fencing, and lighting. Confirm the site evaluation includes drainage assessment, not just a visual inspection. Ask for a projected timeline and how scope changes are handled if unexpected base damage is found during construction.
Will the new court need a lot of ongoing maintenance?
A properly built court with a sound base and correct drainage needs relatively little routine maintenance. Periodic cleaning and crack inspection keep minor issues from growing. Resurfacing is typically needed every several years depending on traffic volume and climate exposure. Catching small cracks early is far cheaper than waiting for base damage to develop.
How do you handle drainage on community courts built on clay-prone ground?
Clay soil holds water and shifts seasonally, which is the most common cause of court cracking in the Greensboro area. The on-site evaluation assesses drainage before design begins. Solutions typically include sub-base aggregate layers and precise surface slope to move water off the court rather than letting it sit and undermine the base.
What happens if a school or HOA court sits on rolling ground with elevation changes?
Significant elevation changes require grading and sub-base work to create a level, properly sloped playing surface. The on-site evaluation measures grade changes and determines how much earthwork is needed. That scope is itemised in the written estimate so there are no surprises once construction begins.
Will a new surface fix our standing water problem?
Only if the design addresses the base and slope, not just the top coat. A court that is patched on the surface without correcting the drainage grade will show the same pooling after the next heavy rain. Drainage correction is scoped as part of the base work, not added later.
What happens if we wait another season before repairing the court?
Cracks that let water into the sub-base widen with each freeze-thaw cycle. A court that qualifies for resurfacing this year may need a full base replacement next year. Delaying typically increases the scope and cost of the eventual repair.
What courts can be built for a HOA or school property?
Tennis, pickleball, basketball, and multiuse courts are all options. A single footprint can be striped for more than one sport. The layout is confirmed based on the available space, the expected users, and how often the court will be in use.
How is this different from hiring a general repair contractor?
Court work requires the surface, base, drainage, and layout to function together. A general patch covers visible damage for a short time but rarely corrects uneven spots, sub-base movement, or water pooling. A court-specific scope addresses all four elements in one project.
Questions
Guarantees & Peace of Mind
How safe and comfortable will the finished surface be for kids, residents, or players?
Finished courts are built to consistent slope tolerances that prevent pooling, and surface coatings provide traction that reduces slip risk. Line marking uses sport-specific dimensions so play areas are accurate and predictable. A final walkthrough is completed before the job is signed off to confirm the surface meets those standards.
What happens if the project uncovers more damage than expected?
The on-site evaluation is designed to surface hidden issues before work starts, not during it. If something unexpected appears once excavation begins, the scope and cost are discussed before proceeding. Nothing is added to the project without the client’s agreement first.
Do you handle permits or local rules for community court projects?
Permit requirements vary by municipality and project scope. Our partners are familiar with local rules across Greensboro, Winston-Salem, High Point, and surrounding areas. Permit needs are identified during the planning phase and factored into the project timeline so the board or school is not caught off guard by approval delays.
Tell Us Your Site & Sport
Every enquiry starts with a free on-site evaluation of your space and drainage, no commitment required.